• Preparation of Environmental Parts of Technical Projects in accordance with requirements set in STR 1.05.05:2004
• Coordination of the approval process with the Regional Environmental Protection Departments and other interested parties
Projects:
Environmental Part of Technical Project for the
Installation of the Scrap Metal (Ferrous and Non-Ferrous) Collection
Site. Client: UAB Kuvyta (2007)
Environmental Part of Technical Project for
Installation of Workshop for Collection and Preparation for Recycling
of Secondary Raw Materials and Packaging Waste. Client: UAB Tikritus
(2007)
Environmental Part of Technical Project for
Construction and Demolition Waste Collection and Sorting Plant. Client:
UAB Trade house Lina (2006)
Environmental Part of Technical Project for Civic
Amenity Site and Sorting Plant of Secondary Raw Materials. Client: UAB
VSA Vilnius (2006)
Environmental Part of Technical Project for Waste Collection and Treatment Site. Client: UAB Cleanaway (2006)
Environmental Part of Technical Project for Mechanical Treatment Plant of Polystyrene Waste. Client: UAB EKO GROUP (2006)
Environmental Part of Technical Project for Concentrated Whey Production Shop. Client: UAB Lavisos agrogrupė (2006)
Preparation of Environmental Part of Technical
Project for Modernisation of Production Site in Piggery No. 3
(equipment for 180 places farrowing and 105 places insemination
piggery). Client: UAB Beržų kompleksas (2006)
Preparation of Environmental Part of Technical
Project for Obtaining Equipment for Meat Treatment and Special
Vehicles. Client: UAB Beržų kompleksas (2006)
Environmental Part of Technical Project for Scrap Metal Collection Site in Ukmergė. Client: UAB Eurovaris (2005)
Environmental Part of Technical Project for
Reconstruction of Klaipėda Terminal (Installation of WEEE Treatment
Bar). Client: UAB Kuusakoski (2005)
Environmental Part of Technical Project for Scrap Tyres Collection and Storage Site. Client: UAB Joniškio agrochemija (2005)
Environmental Part of Technical Project for Scrap Tyres Recycling Plant. Client: UAB Torgita (2005)
Expertise of Environmental Part of Technical Project
for Scrap Tyres Co-incineration in Cement Kiln. Client: AB Akmenės
cementas (2005)
Experience of experts:
Preparation of Environmental Part of Technical
Project for Reconstruction of Calfery into 2900 Places Pig Farm.
Contractor: Centre for Sustainable Industrial Development, client: AB
Beržų kompleksas (2005)
Environmental Part of Technical Project for
Reconstruction of Leisure Centre and Rest-houses in Kirneilė Village,
Molėtai District. Client: UAB GASĮ (2004)